Sundaram-Clayton Limited*
Increase operation production in phase 1 master plan
Phase 1 of a 50-acre master plan in Ridgeville, SC, this 300,000 sq ft manufacturing plant produces a range of aluminum high-pressure die-cast and gravity die-cast automotive parts for Volvo, Cummins, Daimler, Mercedes and WABCO. The project also included a 20,000 sq ft wastewater treatment plant as well. The operation will produce 1,000 tons of castings in the first year of production and in five years it will scale outputĀ to 10,000 tons.
- New Construction | Master Plan
- Electrical l Engineering
- Summerville, SC
- 320,000 sq ft
- *Denotes projects completed by EUA acquired firms