Froedtert South St. Catherine's MOB

Designed with expansion in mind

This project is a four-story multi-tenant Medical Office Building (MOB) intended to allow for future expansion in two subsequent phases both vertically and horizontally. By taking volume out of the existing hospital makes services more accessible to patient in a freestanding medical building. One month before completing construction documents for the initial phase of the project, the owner asked EUA to proceed with plans for the vertical expansion.

In an effort to maintain continuity of construction, EUA preceded with a steel package and the original construction documents simultaneously. During the original design process, EUA found opportunities to shorten the schedule for completing construction documents. With the client, construction manager and EUA working together, the team trimmed 11 weeks off the production schedule. In addition, multiple bid packages allowed construction to begin almost six months earlier than initially planned. By taking volume out of the existing hospital, EUA helped make services more accessible to patients through a cohesive freestanding medical building.